Six case studies

Rooms we have taken apart and put back

Each one lists what was wrong before we started, what we did about it, how long it took and a sample budget. The photographs are the easy part.

01

Every project, with the real numbers

Budgets shown are sample figures for the scope described. Your room, your house and your selections will move them.

The Montford hex-tile bath

Full bathroom remodel · Montford, Asheville · 2025

The Montford hex-tile bath

A 1923 bungalow bathroom with original hex floor worth saving and a shower pan that had been leaking into the dining room ceiling for years.

Budget
$31,400 (sample)
Timeline
4 weeks
The nine-day shower, Malvern Hills

Tub-to-shower conversion · West Asheville · 2025

The nine-day shower, Malvern Hills

A single 5 by 8 hall bath in a 1948 cottage, converted from an unused cast iron tub to a full-height tiled shower without moving a wall.

Budget
$13,900 (sample)
Timeline
9 days
Vanderbilt Road ensuite

Primary ensuite · Biltmore Forest · 2024

Vanderbilt Road ensuite

A large 1960s ensuite replanned around two morning routines, with a steam shower, a separated wet area and book-matched stone.

Budget
$71,200 (sample)
Timeline
7 weeks
Flat Rock level entry

Accessible bathroom · Flat Rock, Henderson County · 2025

Flat Rock level entry

A curbless shower and widened doorway planned four years before it would be needed, built so nothing in the room reads as medical equipment.

Budget
$27,800 (sample)
Timeline
3 weeks
The Haywood Road powder room

Powder room · West Asheville · 2025

The Haywood Road powder room

Twenty-two square feet under a staircase, finished in hand-glazed zellige and a stone trough basin, in six working days.

Budget
$8,600 (sample)
Timeline
6 days
Reems Creek farmhouse bath

Full bathroom remodel · Weaverville · 2024

Reems Creek farmhouse bath

A bathroom carved out of a bedroom in the 1950s, rebuilt with a level floor, a proper drain fall and a window in the wet area.

Budget
$38,750 (sample)
Timeline
5 weeks

04

The Montford bath, before and after

Drag the handle. The parts that took the longest are the ones neither photograph shows.

The Montford bathroom mid-demolition with the shower pan removedBefore
The finished Montford bathroom with handmade ceramic tile and the original hex floorAfter
  1. Before

    A 1980s mortar shower pan over felt, leaking quietly into the dining room ceiling below.

  2. Structure

    Subfloor replaced across the wet area and the waste line re-hung to a correct fall.

  3. Waterproofing

    Bonded membrane with banded corners, then a 24 hour flood test photographed at both ends.

  4. After

    Handmade ceramic in a running bond, original 1923 hex floor lifted, cleaned and reset.

A finished bathroom by Still Water Bath Co.

Next step

Your room could be the seventh

Send a photograph and rough dimensions and we will tell you which of these projects yours most resembles, and what it is likely to cost.

Free measured survey · Fixed written proposal · Bathrooms only

Cookie preferences