Nine days, exactly as quoted. The toilet came out and went back the same afternoon so we were never without it.
Marcus OyelaranWest Asheville · Tub-to-shower conversionFebruary 2026
4.9 from 186 reviews
Sample reviews for a demonstration site. The themes are the ones we hear most: dates hit, sites kept tidy, and the invisible work done properly.
01
4.9
Based on 186 verified reviews (sample figure)
They found the leak in the first hour and spent four weeks making sure it could never happen again. The original 1923 floor is still there.
Dana RutherfordMontford · Full bathroom remodel · March 202602
Sorted newest first. Every one names the area and the job, because a review without a project attached is not worth much.
Nine days, exactly as quoted. The toilet came out and went back the same afternoon so we were never without it.
Marcus OyelaranWest Asheville · Tub-to-shower conversionFebruary 2026
The plan they drew was smaller than what we asked for and better than what we imagined. Seven weeks, no drama.
Priya VenkatesanBiltmore Forest · Primary ensuiteNovember 2025
Guests never notice it is an accessible bathroom. My mother has not needed help in there once.
Eleanor KwanFlat Rock · Accessible bathroomJanuary 2026
Smallest room in the house and the only one anyone photographs. Six days start to finish.
Tomas LeclairWest Asheville · Powder roomApril 2026
They spent two days levelling the floor before laying a single tile. Two winters on, nothing has moved.
Ruth PembertonWeaverville · Full bathroom remodelOctober 2025
The flood test photographs were a nice touch. I had never had a contractor prove the waterproofing before tiling.
Gabriel SantosNorth Asheville · Walk-in showerDecember 2025
Excellent work and a genuinely tidy crew. The glass ran a week late, which they warned us about early.
Nadine BrooksBlack Mountain · Full bathroom remodelSeptember 2025
They built to our occupational therapist's measurements without a single argument. The blocking drawing is in our house file.
Hiroshi TanakaHendersonville · Accessible bathroomFebruary 2026
Our wall is 41 inches. Everyone else wanted to fit a 36 and hide the gap. Still Water measured and built to 41.
Carla MendezNorth Asheville · Vanities & storageMay 2026
The heated floor is the best money we have spent on this house. It comes on at quarter past six and we never think about it.
Jonah FeldmanWest Asheville · Tile & flooringMarch 2026
Quiet, punctual and they cleaned up every single evening. My neighbour booked them before we were finished.
Aisha RobertsonWeaverville · Tub-to-shower conversionJune 2026
03
Certificates are available on request. Licence numbers shown are placeholders on this demonstration site.

Next step
We are happy to put you in touch with a client whose project was the closest match to yours. Just ask on the first call.
Free measured survey · Fixed written proposal · Bathrooms only
We value your privacy
We use cookies to run this site, remember your preferences and understand how it is used.Cookie policy