Tub-to-shower conversion · West Asheville

The nine-day shower, Malvern Hills

A single 5 by 8 hall bath in a 1948 cottage, converted from an unused cast iron tub to a full-height tiled shower without moving a wall.

The nine-day shower, Malvern Hills, finished
Scope
Tub-to-shower conversion
Location
West Asheville
Timeline
9 days
Budget
$13,900 (sample)

01

The brief

One bathroom, two adults, and a cast iron tub that had been used exactly twice in eleven years. The constraint was simple: the household could not lose the toilet for more than a day.

We sequenced the work so the toilet came out on a Tuesday morning and went back the same afternoon, and the rest of the job happened around it.

Nine days, exactly as quoted. We had the toilet back the same day they took it out. I have never had a trade give me a date and then hit it.

Marcus O., West Asheville

02

Before and after, in writing

Photographs only show the finish. This is what actually changed.

Before

  • Cast iron alcove tub, unused
  • Wall-hung basin with no storage
  • Fan vented into the attic
  • Soft subfloor at the tub apron

After

  • Tiled shower to the ceiling with a fixed glass panel
  • Wall-width vanity with a three-drawer bank
  • Fan re-ducted through the soffit
  • Subfloor replaced across the wet area

03

What went into it

Walls
4x16 matte porcelain, stacked
Floor
2x2 porcelain mosaic
Glass
3/8 inch low-iron fixed panel
Valve
Pressure-balanced with handheld
Materials used on The nine-day shower, Malvern Hills
A finished bathroom by Still Water Bath Co.

Next step

Want something like this?

Tell us which parts of this project appeal and we will tell you what they cost in your room, before anyone books a visit.

Free measured survey · Fixed written proposal · Bathrooms only

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.