Tub-to-shower conversion · West Asheville
The nine-day shower, Malvern Hills
A single 5 by 8 hall bath in a 1948 cottage, converted from an unused cast iron tub to a full-height tiled shower without moving a wall.

- Scope
- Tub-to-shower conversion
- Location
- West Asheville
- Timeline
- 9 days
- Budget
- $13,900 (sample)
01
The brief
One bathroom, two adults, and a cast iron tub that had been used exactly twice in eleven years. The constraint was simple: the household could not lose the toilet for more than a day.
We sequenced the work so the toilet came out on a Tuesday morning and went back the same afternoon, and the rest of the job happened around it.
Nine days, exactly as quoted. We had the toilet back the same day they took it out. I have never had a trade give me a date and then hit it.
02
Before and after, in writing
Photographs only show the finish. This is what actually changed.
Before
- Cast iron alcove tub, unused
- Wall-hung basin with no storage
- Fan vented into the attic
- Soft subfloor at the tub apron
After
- Tiled shower to the ceiling with a fixed glass panel
- Wall-width vanity with a three-drawer bank
- Fan re-ducted through the soffit
- Subfloor replaced across the wet area
03
What went into it
- Walls
- 4x16 matte porcelain, stacked
- Floor
- 2x2 porcelain mosaic
- Glass
- 3/8 inch low-iron fixed panel
- Valve
- Pressure-balanced with handheld


Next step
Want something like this?
Tell us which parts of this project appeal and we will tell you what they cost in your room, before anyone books a visit.