Tub removal and disposal
Cast iron cut in place where it will not fit through the door, hauled out and recycled.
Usually finished in nine days
Trading a tub nobody uses for a shower everyone does, in the same footprint, without moving a single wall.
01
This is the most requested job in our shop, and for good reason. A standard 60 inch alcove tub leaves exactly enough room for a generous shower, and because the drain and supply lines are already where we need them, the work stays contained.
We keep the footprint, replace the pan, waterproof the alcove properly, tile the three walls, and finish with a fixed glass panel. Nine working days is typical. Twelve if we find a soft subfloor, which we do about a third of the time in older Asheville houses.
If your household still wants a tub somewhere, we will say so. Resale guidance in Buncombe County still favours at least one tub in the house, and we would rather convert the hall bath than the only tub you own.

Figures are illustrative. Your written proposal is a fixed price for a measured room.
02
Everything below is in the base scope. Nothing here is an upgrade line we take out to make a number look better.
Cast iron cut in place where it will not fit through the door, hauled out and recycled.
We open the floor around the old tub apron and report anything soft before we rebuild.
Sloped, membrane-bonded pan sized to the existing alcove.
Tile to 7 feet or full ceiling height, with a recessed niche.
Single low-iron panel with a clear-shield coating, no track to scrub.
New pressure-balanced valve, trim and shower arm at a height that suits the household.
03
Five stages, in order, with the same crew on site from the first day to the last.
One visit, a fixed price and a nine-day window.
Tub removed, alcove stripped, subfloor checked.
Pan set, waterproofing bonded, flood test overnight.
Walls and floor tiled, niche trimmed.
Panel installed, valve trimmed out, silicone and clean-up.
04
What moves the price
These are the decisions we talk through at the measuring visit, because each one moves the figure more than the tile you pick.
A cast iron tub has to be broken up in the room. Add half a day and extra protection for the hallway.
Stopping at 7 feet is standard. Going to the ceiling adds about 12 percent to material and one working day.
One niche is included. A second niche or a bench adds framing and waterproofing detail.
If the existing valve sits too deep for modern trim we open the back wall, which is straightforward from a closet and fussy from a finished hallway.

Next step
Send a photograph and rough dimensions. We reply the same working day with an honest range, before anyone books a visit.
Free measured survey · Fixed written proposal · Bathrooms only
05
Only if it leaves the house with no tub at all. Buyers with small children look for one. If you have two bathrooms, converting the one nobody uses is a sensible move.
In most alcoves, yes. The tub drain sits close to where a shower drain needs to be, so we adapt rather than reroute.
The conversion price covers the shower. Replacing the bathroom floor is a common add-on and only adds two days if we are already on site.
A 30 to 36 inch fixed panel keeps water in for most showers and is far easier to clean. We only recommend a door for narrow alcoves with a high-flow head.
We value your privacy
We use cookies to run this site, remember your preferences and understand how it is used.Cookie policy