Galvanised supply replacement
Original steel lines are usually well past their service life. We replace back to an accessible joint.
8 minutes from the studio
North Asheville bathrooms are usually original, often beautiful, and almost always plumbed with something we have to replace.
01
Grove Park and Lakeview Park are full of houses built between 1920 and 1955, with plaster walls, cast iron waste stacks and hex-tile floors that are worth saving where we can. We have salvaged and reset original floor tile on three North Asheville projects, and replaced it faithfully on several more.
The recurring work here is galvanised supply line replacement, cast iron tub removal, and rebuilding shower pans that were mortar-bedded over felt and have been leaking quietly into the ceiling below for a decade. We open a small inspection hole before we quote so there are fewer surprises.
Parking is tight on the older streets, so we run a single van and stage material inside the garage where a client has one. Dust walls go up on day one because these houses move air freely.

02
Every neighbourhood has its own recurring problem. These are the four we budget for here before we even see the room.
Original steel lines are usually well past their service life. We replace back to an accessible joint.
Broken up in the room and carried out in pieces, with the hallway fully protected.
Skim and key repairs rather than wholesale drywall, so the room keeps its original texture.
Where hex or subway tile is intact and worth keeping, we work around it and match the missing pieces.
03
These four cover the majority of what we are asked for here. The full list runs to eight.
04
Nine days, exactly as quoted. The toilet came out and went back the same afternoon so we were never without it.
Marcus Oyelaran, West Asheville · Tub-to-shower conversion
Smallest room in the house and the only one anyone photographs. Six days start to finish.
Tomas Leclair, West Asheville · Powder room

Next step
Tell us the street and the room. We will tell you what we usually find in houses like yours and roughly what it costs to put right.
Free measured survey · Fixed written proposal · Bathrooms only
05
06
If yours is not here, call the studio. We would rather answer it now than have you guess.
Nine to twelve days for a conversion, three to five weeks for a full remodel, four to seven weeks for a larger ensuite. You get a week-by-week schedule at the pre-construction meeting and a photo update every Friday.
Yes, and we plan around it. We sequence the toilet so you lose it for a single day rather than the whole project, and we can arrange a temporary unit for the days when the floor is open.
We build a sealed dust wall at the doorway, run a negative-air machine while we demolish, cover the route from your front door, and vacuum at the end of every day. It is a construction site, but it stays contained to one room.
The crew arrives at 8 am and packs up by 4:30 pm, Monday to Friday. We do not work weekends unless you ask us to, and we never start early without agreeing it with you first.
We value your privacy
We use cookies to run this site, remember your preferences and understand how it is used.Cookie policy