Curbless pans and clear glass

Walk-in showers

A shower you step into rather than climb over, built on a sloped pan that drains properly and never puddles at the threshold.

01

What this actually involves

A walk-in shower is mostly invisible work. The part you see is glass and tile. The part that decides whether it lasts twenty years is the pan slope, the membrane laps and the way the drain is tied into the waste line.

We build curbless pans by recessing the subfloor between joists, which keeps the finished floor level with the rest of the room. Where joist direction makes that impossible we use a low 1.5 inch ramp instead of a 4 inch curb, and we tell you which one your house allows before you pick tile.

Every shower we build is flood-tested for 24 hours before a single tile goes on. We photograph the water line at the start and the end of the test and send you both pictures.

  • Step-free entry that still drains fast
  • 24-hour flood test documented with photographs
  • Niche and bench sized around the bottles you actually own
  • Glass measured after tile so panels sit flat
Walk-in showers in an Asheville home
Sample budget
$11,500 - $24,000 (sample range)
Time on site
9 - 14 days on site
Best for
Households that want a step-free, easy-to-clean wet area

Figures are illustrative. Your written proposal is a fixed price for a measured room.

02

What is included

Everything below is in the base scope. Nothing here is an upgrade line we take out to make a number look better.

Sloped pan construction

Recessed or ramped pan built to a true quarter-inch-per-foot fall toward the drain.

Bonded waterproof membrane

Seams and corners banded, then flood-tested for 24 hours and documented.

Linear or centre drain

Linear drains along the back wall let us use large-format tile with a single-plane slope.

Niche and bench

Recessed niche framed between studs and pitched slightly so water runs out, not in.

Glass panel or enclosure

Measured after tile, fabricated locally, 3/8 inch low-iron glass with a clear coating.

Valve and head selection

Thermostatic or pressure-balanced valves, with rainfall and handheld options set at the right heights.

03

How the work runs

Five stages, in order, with the same crew on site from the first day to the last.

  1. Site check

    We look at joist direction, drain location and ceiling access underneath.

  2. Demolition

    Old tub or shower out, framing exposed, drain reworked.

  3. Pan and membrane

    Pan built, membrane bonded, flood test run overnight.

  4. Tile and grout

    Wall and floor tile set, niche trimmed, grout and sealant.

  5. Glass and valve trim

    Glass measured and installed once tile has cured, then fixtures fitted.

04

What moves the price

Four things that change the number

These are the decisions we talk through at the measuring visit, because each one moves the figure more than the tile you pick.

Curbless vs low ramp

A recessed curbless pan needs joist access from below. If your bathroom sits over a finished ceiling, a 1.5 inch ramp is the sensible alternative.

Drain style

Linear drains cost more in parts but allow bigger tile and fewer cuts, which often evens out on labour.

Glass specification

A single fixed panel is far less than a hinged door with header and hardware. Low-iron glass adds roughly 15 percent.

Wall height

Tiling to the ceiling instead of stopping at 7 feet adds material and a day of labour, and it makes a small room read taller.

A finished bathroom by Still Water Bath Co.

Next step

Ready to talk about walk-in showers?

Send a photograph and rough dimensions. We reply the same working day with an honest range, before anyone books a visit.

Free measured survey · Fixed written proposal · Bathrooms only

05

Questions about this work

Not when the pan is built correctly. The floor inside the wet area slopes toward the drain, and a linear drain at the back wall pulls water away from the opening. We also set the shower head so spray travels inward.

For a comfortable step-in we aim for at least 30 inches of clear opening, and 36 inches if a walker or wheelchair may ever need to pass through.

Sometimes. If the drain is centred and the waste line is in good condition we can adapt it. For a linear drain along a wall we almost always reroute.

Grout and sealant need about 48 hours. We schedule glass for the last day so the shower is ready two days after tile is finished.