Heated floors and wet-area tile

Tile & flooring

Layout drawn before the first cut, membrane under every wet area, and an electric mat under the floor so the room is warm by the time you are awake.

01

What this actually involves

Tile is the most visible thing we do and the easiest to do badly. A good installation starts on paper: we draw the room, find the centre lines, and decide where the cuts land so you never get a half-inch sliver at the doorway or a cut course at eye height in the shower.

Underneath, wet areas get a bonded sheet or liquid membrane rather than the old felt-and-wire approach. Floors get an uncoupling membrane so seasonal movement in an old mountain house does not crack your grout in year two.

Heated floors are the upgrade people thank us for most. An electric mat under porcelain, a programmable thermostat, and a 6:15 am start time turns a cold tile floor into the nicest surface in the house for about the running cost of a light bulb.

  • Cuts land where they should, not at eye level
  • Uncoupling membrane so grout does not crack in year two
  • Heat mat resistance tested three times during install
  • Flexible sealant at corners instead of rigid grout that splits
Tile & flooring in an Asheville home
Sample budget
$3,800 - $16,000 (sample range)
Time on site
5 - 10 days on site
Best for
Cracked grout, cold floors and tired 1990s tile

Figures are illustrative. Your written proposal is a fixed price for a measured room.

02

What is included

Everything below is in the base scope. Nothing here is an upgrade line we take out to make a number look better.

Scaled layout drawing

Centre lines and cut positions worked out before anything is scored.

Substrate preparation

Self-levelling compound where the floor is out, uncoupling membrane over the top.

Waterproofing to wet areas

Bonded membrane with banded corners and a documented flood test.

Electric floor heating

Mat, sensor and programmable thermostat, with a dedicated circuit.

Tile setting and grout

Large-format, mosaic, herringbone or basketweave, set to the drawn layout.

Transitions and sealant

Thresholds, schluter edges and colour-matched flexible sealant at changes of plane.

03

How the work runs

Five stages, in order, with the same crew on site from the first day to the last.

  1. Layout

    Room measured and drawn, cuts positioned, dry lay for patterns.

  2. Prep

    Old tile out, floor levelled, membrane bonded.

  3. Heat mat

    Mat laid and tested for resistance before and after embedding.

  4. Set

    Tile set in sections with consistent joints.

  5. Grout and seal

    Grout, clean, then sealant at every corner and change of plane.

04

What moves the price

Four things that change the number

These are the decisions we talk through at the measuring visit, because each one moves the figure more than the tile you pick.

Pattern

A straight stack is fastest. Herringbone and basketweave roughly double the setting labour because of cuts and layout control.

Tile size

Large-format tile covers ground fast but needs a flatter substrate, so prep costs rise as tile size grows.

Heated area

Heat mats are priced by square foot of coverage. We leave a margin around fixtures, so a small room heats for very little.

Existing floor

Tile over an old mortar bed is slow to remove. Vinyl over plywood comes up in an afternoon.

A finished bathroom by Still Water Bath Co.

Next step

Ready to talk about tile & flooring?

Send a photograph and rough dimensions. We reply the same working day with an honest range, before anyone books a visit.

Free measured survey · Fixed written proposal · Bathrooms only

05

Questions about this work

For a typical 40 square foot hall bath on a timer running two hours a day, the running cost is comparable to leaving a couple of light bulbs on. The thermostat only heats the floor, not the room.

We strongly prefer not to. It raises the floor, complicates the door and threshold, and hides whatever is failing underneath.

One shade darker than the tile hides traffic without drawing a grid. Bright white looks wonderful for eleven months.

We use a high-performance grout that needs no sealing in most cases. Where a client chooses cement grout, we seal at handover and leave you the product.