Services

Eight things we build, and nothing else

Every job below happens inside a bathroom. We do not take kitchens, additions or whole-home work, which is why the same crew can build the same room every week.

01

Pick the room, or pick the problem

Four whole-room projects and four focused jobs. If you are not sure which one you need, call and describe the room.

Full bathroom remodel by Still Water Bath Co.

Full bathroom remodel

Down to the studs, back to calm

We take the room apart, correct what is hiding behind the walls, and rebuild it as one quiet, well-drained, well-lit space.

Sample budget
$24,000 - $52,000 (sample range)
Time on site
3 - 5 weeks on site
Walk-in showers by Still Water Bath Co.

Walk-in showers

Curbless pans and clear glass

A shower you step into rather than climb over, built on a sloped pan that drains properly and never puddles at the threshold.

Sample budget
$11,500 - $24,000 (sample range)
Time on site
9 - 14 days on site
Tub-to-shower conversion by Still Water Bath Co.

Tub-to-shower conversion

Usually finished in nine days

Trading a tub nobody uses for a shower everyone does, in the same footprint, without moving a single wall.

Sample budget
$9,800 - $18,500 (sample range)
Time on site
9 - 12 days on site
Vanities & storage by Still Water Bath Co.

Vanities & storage

Built-ins sized to your room

Cabinetry measured for the wall you actually have, with drawers that clear the plumbing and a top that does not stain.

Sample budget
$4,200 - $13,500 (sample range)
Time on site
4 - 8 days on site
Tile & flooring by Still Water Bath Co.

Tile & flooring

Heated floors and wet-area tile

Layout drawn before the first cut, membrane under every wet area, and an electric mat under the floor so the room is warm by the time you are awake.

Sample budget
$3,800 - $16,000 (sample range)
Time on site
5 - 10 days on site
Accessible & aging-in-place bathrooms by Still Water Bath Co.

Accessible & aging-in-place bathrooms

Aging in place, without the clinic look

Grab bars that look like towel bars, a zero-threshold entry, and blocking in the walls so the room can adapt again in ten years.

Sample budget
$14,500 - $34,000 (sample range)
Time on site
2 - 4 weeks on site
Powder rooms by Still Water Bath Co.

Powder rooms

Small footprint, big impression

The one room every guest sees on their own. Small enough to be brave with, and finished in about a week.

Sample budget
$5,400 - $14,000 (sample range)
Time on site
5 - 7 days on site
Primary ensuite by Still Water Bath Co.

Primary ensuite

The quiet room off your bedroom

A larger bathroom planned around morning routines: two of everything where it matters, a separate wet area, and lighting that works at 6 am and at 10 pm.

Sample budget
$32,000 - $78,000 (sample range)
Time on site
4 - 7 weeks on site

05

Three ways to remodel a bathroom

Most enquiries land in one of these three. The honest difference is how much of the room comes out, not how nice the tile is.

Comparison of a refresh, a full bathroom remodel and an ensuite rebuild
DetailRefreshSame footprint, new wet area.Full remodelMost requestedDown to the studs and back.EnsuiteA larger room, planned around two routines.
Typical budget$9,800 - $18,500$24,000 - $52,000$32,000 - $78,000
Time on site9 - 12 days3 - 5 weeks4 - 7 weeks
How far we goTub out, tiled shower in, no walls movedEverything out to framing, layout adjustableReplanned inside the footprint, wet area separated
PlumbingAdapted to the existing drain and valve positionSupply and waste renewed, fixtures relocated where it helpsNew manifold runs, thermostatic valves, optional steam
WaterproofingNew bonded pan, flood-tested overnightFull wet area membrane, banded corners, 24 hour testFull enclosure including a sealed, sloped ceiling
FloorExisting floor kept, or re-tiled as an add-onLevelled, heated and re-tiled floor to ceilingHeated large-format porcelain or slab stone
LightingNew fixture and a quiet ducted fanTwo circuits plus a humidity-sensed fanThree dimmable circuits and a floor-level night light
GlassOne fixed panelFixed panel or hinged doorLow-iron enclosure to the ceiling
Best forA bathroom that works but looks tiredLayout, drainage or subfloor problemsTwo people sharing one bathroom every morning
Learn moreRead the detailRead the detailRead the detail
A finished bathroom by Still Water Bath Co.

Next step

Not sure which one you need?

Describe the room on the phone and we will tell you which of the eight it is, and roughly what it costs, before anyone visits.

Free measured survey · Fixed written proposal · Bathrooms only

07

Design and material questions

If yours is not here, call the studio. We would rather answer it now than have you guess.

Talk to the studio

(828) 555-0211

Mon - Thu 8:00 am - 5:00 pm

All questions

Everything that affects the rough-in, yes: valve type, drain style, fixture positions and vanity size. Paint colour and hardware finish can be settled during the build. We will tell you which decisions are on the critical path.

Client-supplied tile is usually fine if you order enough and we approve the specification. Client-supplied valves we handle case by case, because if the cartridge fails in year two we need to be able to get the part locally.

For most clients it is the single upgrade they mention a year later. An electric mat under porcelain on a two-hour timer costs relatively little to run and changes how the room feels on a January morning.

Non-negotiable in our work. Every bathroom we finish gets a fan sized to room volume, ducted in rigid pipe to the exterior, and wired to a humidity sensor rather than the light switch.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.