Second-home scheduling
Work carried out while the house is empty, with photo updates every few days.
25 minutes east on I-40
Mixed housing stock and a lot of second homes, which changes how we schedule and how we winterise.
01
Black Mountain and Montreat include a high proportion of seasonal homes, so we do a lot of work in shoulder season while the house is empty. That is an efficient way to run a project, and it means we send more photographs than usual because the client is often not in town.
Older cabins in Cragmont and along Montreat Road bring their own issues: crawl space plumbing that has frozen at least once, uninsulated exterior walls behind the shower, and floor structures that were not designed for a stone floor. We check all three before quoting.
For unoccupied homes we install a freeze alarm during construction and leave written winterisation notes at handover.

02
Every neighbourhood has its own recurring problem. These are the four we budget for here before we even see the room.
Work carried out while the house is empty, with photo updates every few days.
Insulating and rerouting supply lines that have frozen before.
Opening the shower wall is the only chance to insulate it properly.
Joist spans reviewed before we specify stone or a cast iron tub.
03
These four cover the majority of what we are asked for here. The full list runs to eight.
04
Excellent work and a genuinely tidy crew. The glass ran a week late, which they warned us about early.
Nadine Brooks, Black Mountain · Full bathroom remodel

Next step
Tell us the street and the room. We will tell you what we usually find in houses like yours and roughly what it costs to put right.
Free measured survey · Fixed written proposal · Bathrooms only
05
06
If yours is not here, call the studio. We would rather answer it now than have you guess.
Nine to twelve days for a conversion, three to five weeks for a full remodel, four to seven weeks for a larger ensuite. You get a week-by-week schedule at the pre-construction meeting and a photo update every Friday.
Yes, and we plan around it. We sequence the toilet so you lose it for a single day rather than the whole project, and we can arrange a temporary unit for the days when the floor is open.
We build a sealed dust wall at the doorway, run a negative-air machine while we demolish, cover the route from your front door, and vacuum at the end of every day. It is a construction site, but it stays contained to one room.
The crew arrives at 8 am and packs up by 4:30 pm, Monday to Friday. We do not work weekends unless you ask us to, and we never start early without agreeing it with you first.