Curbless walk-in showers
Crawl space access makes recessed pans practical in most ranch homes.
30 minutes south on I-26
Our accessible and aging-in-place work concentrates here, often planned years ahead of when it is needed.
01
Hendersonville and Flat Rock have a large population of homeowners who intend to stay in the house for the rest of their lives, and they plan accordingly. Roughly half our accessible bathroom projects are in this area, and most were booked months in advance rather than after an accident.
We work with several occupational therapists in Henderson County and are comfortable building to their written recommendations. Where a client is not ready for grab bars, we install blocking and leave a marked drawing so any contractor can find it later.
Single-level ranch houses make curbless showers straightforward here, because the floor structure is usually accessible from a crawl space.

02
Every neighbourhood has its own recurring problem. These are the four we budget for here before we even see the room.
Crawl space access makes recessed pans practical in most ranch homes.
Bars specified in the same finish as the taps, on tested blocking.
Taller toilets, lever handles and thermostatic valves.
Backing installed now and documented so bars can be added in an afternoon later.
03
These four cover the majority of what we are asked for here. The full list runs to eight.
04
They built to our occupational therapist's measurements without a single argument. The blocking drawing is in our house file.
Hiroshi Tanaka, Hendersonville · Accessible bathroom

Next step
Tell us the street and the room. We will tell you what we usually find in houses like yours and roughly what it costs to put right.
Free measured survey · Fixed written proposal · Bathrooms only
05
06
If yours is not here, call the studio. We would rather answer it now than have you guess.
Nine to twelve days for a conversion, three to five weeks for a full remodel, four to seven weeks for a larger ensuite. You get a week-by-week schedule at the pre-construction meeting and a photo update every Friday.
Yes, and we plan around it. We sequence the toilet so you lose it for a single day rather than the whole project, and we can arrange a temporary unit for the days when the floor is open.
We build a sealed dust wall at the doorway, run a negative-air machine while we demolish, cover the route from your front door, and vacuum at the end of every day. It is a construction site, but it stays contained to one room.
The crew arrives at 8 am and packs up by 4:30 pm, Monday to Friday. We do not work weekends unless you ask us to, and we never start early without agreeing it with you first.
We value your privacy
We use cookies to run this site, remember your preferences and understand how it is used.Cookie policy